Projects

Remote Inspection Techniques 1 Remote Inspection Techniques 2 Remote Inspection Techniques 3

Remote Inspection Techniques (RIT), using Rope Access in a Bulk Carrier anchored in Brazil.

Presentation of Marpol 19F Equivalency Calculation

Marpol 19F Equivalency Calculation. Georgios Maroudis presenting this work to the audience of the Hellenic Joint Branch (RINA & IMAREST) in Piraeus at Ceres Auditorium on 27/5/2010.

Single to Double Hull Marpol 13F and Ice Class Conversion

Single to Double Hull Marpol 13F and Ice Class Conversion. Our activity included all necessary studies, drawings, field attendance and UTMs.

Single to Double Hull Marpol 13F conversion project

Single to Double Hull Marpol 13F. Our activity included all necessary studies and drawings.

Single to Double Hull Marpol 13F chemical conversion project

Single to Double Hull Marpol 13F. Our activity included all necessary studies and drawings.

Single to Double Hull Marpol 13F and IMO III Chemical Carrier Conversion

Single to Double Hull Marpol 13F and IMO III Chemical Carrier Conversion. Our activity included the necessary studies and drawings for the IMO III conversion and field attendance for the Marpol 13F conversion.

Full studies for vessel reactivation

Full studies for vessel reactivation and drawings for crane pedestals.

Design of CO2 system for engine room

Design of CO2 system for the engine room.

Heating coils installation project

Heating coils installation.

Marpol 13F Double Skin Conversion

Marpol 13F Double Skin Conversion.

Single to Double Hull Marpol 13F project

Single to Double Hull Marpol 13F.

Single to Double Hull Marpol 13F with field attendance and UTM

Single to Double Hull Marpol 13F. Our activity included all necessary studies, drawings, field attendance and UTM.

Single to Double Hull Marpol 13F studies and drawings

Single to Double Hull Marpol 13F. Our activity included all necessary studies and drawings.

Single to Double Hull Marpol 13F conversion studies

Single to Double Hull Marpol 13F. Our activity included all necessary studies and drawings.

Double Side to Single Skin Conversion

Double Side to Single Skin Conversion. Our activity included all necessary studies and drawings.

Condition Survey and Damage Investigation

Condition survey and damage investigation.

6T to 10T Manifold Cranes Upgrade

6T to 10T manifold cranes upgrade.

UTMs and re-scantling evaluation

UTMs and re-scantling evaluation.

Special Survey Attendance and Owner Representation

Special survey attendance and owner’s representation.

Single to Double Hull Marpol 13F with field attendance

Single to Double Hull Marpol 13F. Our activity included all necessary studies, drawings and field attendance.

Marpol 19F Equivalency Calculation

Marpol 19F Equivalency Calculation. During the sister vessel’s design approval conversion process, outflow calculations and Class / Flag correspondence were carried out, allowing the vessel to trade globally as Marpol 19F Equivalent without requiring the sister conversion.