Single to Double Hull Marpol 13F and Ice Class Conversion
Our Activity Included All the Necessary Studies/Drawings, Field Attendance and UTMs.

Single to Double Hull Marpol 13F Our Activity Included all the Necessary Studies/Drawings.

Single to Double Hull Marpol 13F
Our Activity Included all the Necessary Studies/Drawings.

Single to Double Hull Marpol 13F and IMO III Chemical Carrier Conversion. Our Activity Included the necessary Studies/Drawings for the IMO III Conversion and field attendance for the Marpol 13F Conversion.

Full Studies for her reactivation and Drawings for her Cranes Pedestals.

Design of CO2 System iwo her E/R.

Heating Coils Installation.

Marpol 13F Double Skin Conversion .

Single to Double Hull Marpol 13F.

Single to Double Hull Marpol 13F. Our Activity Included All the Necessary Studies/Drawings & Field Attendance and UTM.

Single to Double Hull Marpol 13F
Our Activity Included all the Necessary Studies/Drawings.

Single to Double Hull Marpol 13F
Our Activity Included All the Necessary Studies/Drawings.

Double Side to Single Skin Conversion
Our Activity Included All the Necessary Studies/Drawings.

Condition Survey/Damage Investigation.

6T to 10T Manifold Cranes Upgrade.

UTMs and Re-scantling Evaluation.

Special Survey Attendance and Owner’s Representation.

Single to Double Hull Marpol 13F
Our Activity Included All the Necessary Studies/Drawings and Field Attendance.

Marpol 19F Equivalency Calculation
During her sister’s Design-Approval-Conversion process, an outflow calculation and Class/Flag correspondence was in progress as well and now Renaissance trading globally as “Marpol 19F Equivalent” without doing her sister's conversion and without anymore facing a 2010 phase out end.

Marpol 19F Equivalency Calculation.
Georgios Maroudis presenting our job to the audience of the Hellenic Joint Branch (RINA & IMAREST) in Piraeus at Ceres auditorium 27/5/2010.